Your partner between the project and the supply chain.

We are a Qingdao-based exporter of lithium energy storage solutions, working directly with certified manufacturers to supply battery packs, battery cabinets and containerised systems to residential, commercial and industrial projects worldwide.

Energy storage cabinets installed in an industrial plant room
Who we are

A trading house with
engineering in the room.

Most exporters introduce a factory and step back. We stay in the middle of the conversation — translating your load profile into a configuration, checking it against the manufacturer's capability, and following the units through production, testing and the container.

Through direct partnerships with certified manufacturers, we deliver reliable products, flexible customisation and seamless export services — from product sourcing to logistics. Our solutions have been deployed across Southeast Asia, the Middle East and Africa.

  • Direct manufacturer relationships — no layered trading margin
  • One contact from enquiry to bill of lading
  • Bilingual technical documentation as standard
3Storage product platforms
3Continents served
10yrSystem warranty
24hResponse commitment
What we supply

Three levels of packaging.
One supply chain.

From bare packs for integrators to fully assembled cabinets for EPC contractors, the product leaves the factory at the level of integration your project is ready for.

Battery packs

LFP modules with integrated BMS, IP67 rated, supplied to integrators and assemblers who build their own enclosure.

Battery cabinets

Liquid-cooled, all-in-one AC-coupled cabinets from 261 to 488 kWh — the three platforms on this site.

Containerised BESS

Multi-cabinet systems assembled, cabled and tested in 10 ft and 20 ft containers for utility-scale sites.

Markets

Where our cabinets
are already running.

Three regions with very different grid conditions, climates and import rules — which is why the same platform ships with configurable voltage windows, protection levels and documentation.

Southeast Asia

Heat, humidity, weak grids

Liquid cooling and IP55 enclosures hold up where ambient temperatures sit above 35 °C for months, and off-grid mode covers frequent outages.

Middle East

Peak demand and dust

High-power models carry the afternoon air-conditioning peak, with derating plans for sites above 3,000 m and filtration for dust ingress.

Africa

Diesel displacement

Microgrid and off-grid configurations replace generator hours, cutting fuel logistics and maintaining supply through unstable grid windows.

How we work

Four steps,
no surprises.

The sequence is the same for a single cabinet and for a containerised system — only the depth of each step changes.

01 / Specification

Understand the site

Peak demand, daily consumption, grid voltage and frequency, ambient conditions, available footprint.

02 / Configuration

Size the system

Model selection, quantity, container plan and a power study covering overload and backup duration.

03 / Production

Build and test

Factory assembly, capacity and insulation testing, documentation package, pre-shipment inspection.

04 / Logistics

Ship and support

Export documentation, FOB Qingdao or CIF terms, plus commissioning guidance and O&M training.

All-in-one energy storage cabinet, front view
Why us

We are judged on
the second order.

Anyone can win the first container with a price. We would rather earn the repeat order by being straight about lead times, certification scope and what a cabinet will actually do on your site.

  • Certified products: IEC 62619, IEC 62933, UL 1973, CE, UN 38.3
  • Flexible customisation: voltage window, enclosure, comms protocol
  • 10-year warranty with 80% capacity retention at 6,000 cycles
  • 48-hour on-site service commitment, 10-year spare parts availability
Work with us

Let's talk about
your next project.

Whether you need one cabinet for a factory or a containerised system for a microgrid, start with a short description of the site.